Video and pics.

Unit Unpacked………

Mini highbanker goldhog

1- insert the legs and the eye bolts.

2bracket

2- put in all 4 legs

3alllegs

3- separate plumbing on the hose connection end.

4plumb

4- threads will only grab a little bit.

5plumb

5- all installed
6plumb

6- connect the header box support arm top and bottom.

7supportarm

7- leave bolt on sluice, slide on arm, add wingnut.

8lowerarm

8- with mats and moss in sluice add the hold down as shown.

9holddown

9- add wingnut underneath to hold down

10holddown2

10- install dampener mat / pool mat as shown.

11dampener

11-  if you ordered clay claw install as seen below. Just make sure when it swings up it does not hit the spray tube.

12claw

12- loosen wingnuts slightly  and adjust the grizzly bars. Just make sure they don’t hit the sluice when you lift the box up.

13grizz

13-  You’re all set to run.

14whole